Inntel Hotel | Scheveningen

Status: In progress
Location: Scheveningen
Client: Boele & van Eesteren

Boele & van Eesteren | 11.000 m2 BVO | 225 rooms | panel-, steel wall-, floor formwork and windshields

This project is part of the redevelopment of the area, and it is the realisation of an Inntel Hotel at the top of the harbour head.  The hotel will be the striking border marking the end of the boulevard of Scheveningen and the beginning of the harbour entrance.

The architecture of the hotel embraces the dynamics of a sailing race start with bulging sails in the wind. KCAP Rotterdam is responsible for the design of the building. On the ground floor will be a restaurant with a terrace and on the top floor, a wellness area with a swimming pool and a rooftop terrace overlooking the sea and harbour.

Operations

Red Betonbouw offers a total package, starting at the preliminary stages toward the calculations and final realisation of your project. With this way of working, we can think along with you from the beginning onwards about construction methods and possible alternatives. The realisation of a high-quality project takes more than solely the professional knowledge that we possess. Red Betonbouw places great care on putting the right people on the right job. We solely work with the best that the market has to offer, and a big part of those resources we manage ourselves. 

News

23/03 '20

Corona effects on Red Betonbouw

Corona effects on Red betonbouw

Read more >
28/02 '20

How do you make 15 meter high concrete columns?

Challenge for team RED Betonbouw: 15 meter high column formwork and concrete pour.

Read more >
30/01 '20

Sneak peak

Sneak peak behind the scenes RED Betonbouw / Inntel Hotel

Read more >
27/11 '19

First impression Column casting for high rise constructions

These eight-meter tall columns are cast and create a special first impression for 15 meter high columns

Read more >
14/11 '19

Start concrete works Stadspark | IJmuiden

After overcoming many obstacles, we have started the tunnel formwork for Dura Vermeer.

Read more >
10/10 '19

Commissioning the use of two Tesla’s

RED Betonbouw is replacing fuelled cars for electric ones.

Read more >
30/09 '19

Het Hof van Capelle | Kroon & de Koning

Recieved an order from Kroon & de Koning  for the construction of 88 apartments in Capelle a/d IJssel

Read more >
18/07 '19

The mentality of Rotterdam

"If it does not go as it is ment, then it is ment to go as it is"

Read more >
03/06 '19

Experimenting with safety improvements using SkyReach Anchor

At our project for Intell Scheveningen, we have started using two units of SkyReach Anchor.

Read more >
17/05 '19

High rise construction pump to Europain Medicines Agency (EMA)

In cooperation with Vloertechniek RED Betonbouw has placed our high rise construction pump.

Read more >

2019 | Developed by Zeno Webdevelopment