Projects

Hof van Capelle | Capelle a/d IJssel

Kroon & De Koning 88 apartments | 270m2 of commercial space | steel wall, panel and tunnel formwork

Overhoeks Blok K | Amsterdam

Dura Vermeer | 10.000 m2 | 77 apartments | Tunnel formwork

Newport toren C | Rotterdam

Van Omme & De Groot | 93 apartments | Panel-, steel wall- and tunnel formwork.

Inntel Hotel | Scheveningen

Boele & van Eesteren | 11.000 m2 BVO | 225 rooms | panel-, steel wall-, floor formwork and windshields

Load more projects...

News

23/03 '20

Corona effects on Red Betonbouw

Corona effects on Red betonbouw

Read more >
28/02 '20

How do you make 15 meter high concrete columns?

Challenge for team RED Betonbouw: 15 meter high column formwork and concrete pour.

Read more >
30/01 '20

Sneak peak

Sneak peak behind the scenes RED Betonbouw / Inntel Hotel

Read more >
27/11 '19

First impression Column casting for high rise constructions

These eight-meter tall columns are cast and create a special first impression for 15 meter high columns

Read more >
14/11 '19

Start concrete works Stadspark | IJmuiden

After overcoming many obstacles, we have started the tunnel formwork for Dura Vermeer.

Read more >
10/10 '19

Commissioning the use of two Tesla’s

RED Betonbouw is replacing fuelled cars for electric ones.

Read more >
30/09 '19

Het Hof van Capelle | Kroon & de Koning

Recieved an order from Kroon & de Koning  for the construction of 88 apartments in Capelle a/d IJssel

Read more >
18/07 '19

The mentality of Rotterdam

"If it does not go as it is ment, then it is ment to go as it is"

Read more >
03/06 '19

Experimenting with safety improvements using SkyReach Anchor

At our project for Intell Scheveningen, we have started using two units of SkyReach Anchor.

Read more >
17/05 '19

High rise construction pump to Europain Medicines Agency (EMA)

In cooperation with Vloertechniek RED Betonbouw has placed our high rise construction pump.

Read more >

2019 | Developed by Zeno Webdevelopment