News

Start concrete works Stadspark | IJmuiden 14/11 '19

Start concrete works Stadspark | IJmuiden

After overcoming many obstacles, we have started the tunnel formwork for Dura Vermeer.

Positive news for the housing market in IJmuiden, because we have now started with the structural work for 54 starters apartments. Tunnel formwork has been delivered, and the first concrete has been poured. Together with Dura Vermeer Red Betonbouw is going to make sure that the project is completed in a safe and orderly manner.

News

23/03 '20

Corona effects on Red Betonbouw

Corona effects on Red betonbouw

Read more >
28/02 '20

How do you make 15 meter high concrete columns?

Challenge for team RED Betonbouw: 15 meter high column formwork and concrete pour.

Read more >
30/01 '20

Sneak peak

Sneak peak behind the scenes RED Betonbouw / Inntel Hotel

Read more >
27/11 '19

First impression Column casting for high rise constructions

These eight-meter tall columns are cast and create a special first impression for 15 meter high columns

Read more >
14/11 '19

Start concrete works Stadspark | IJmuiden

After overcoming many obstacles, we have started the tunnel formwork for Dura Vermeer.

Read more >
10/10 '19

Commissioning the use of two Tesla’s

RED Betonbouw is replacing fuelled cars for electric ones.

Read more >
30/09 '19

Het Hof van Capelle | Kroon & de Koning

Recieved an order from Kroon & de Koning  for the construction of 88 apartments in Capelle a/d IJssel

Read more >
18/07 '19

The mentality of Rotterdam

"If it does not go as it is ment, then it is ment to go as it is"

Read more >
03/06 '19

Experimenting with safety improvements using SkyReach Anchor

At our project for Intell Scheveningen, we have started using two units of SkyReach Anchor.

Read more >
17/05 '19

High rise construction pump to Europain Medicines Agency (EMA)

In cooperation with Vloertechniek RED Betonbouw has placed our high rise construction pump.

Read more >

2019 | Developed by Zeno Webdevelopment